| Overview | |
| Cessna Citation II available for sale. Located in Smithfield, NC. Features new paint in 2022, interior refurbishment and stretch modification in 2021, ADS-B Out, WAAS, and enclosed belted lavatory. Maintained under FAR Part 91 with RVSM certification. All five phase inspections completed as of 08/25. | |
| Price: |
$750,000 USD
|
| Offered By: | Omnijet |
| Registration: | N550NB |
| S/N: | 550-0396 |
| Location: |
Smithfield, North Carolina United States
|
| Days Active: | 50 days ago |
| Airframe | |
|
Total Time: 6,982 hours Total Landings: 6,532 |
|
| Total Time: | 6,982 Hours |
| Landing Cycles: | 6,532 |
| Number of Seats: | 11 |
| Pressurized: | Yes |
| Avionics | |
|
ADS-B Out WAAS J.E.T. 2-inch Standby Gyro AOA Indicator Dual Collins Audio Panels |
|
| Additional Equipment | |
|
Rohr Thrust Reversers 64 Cubic Foot Oxygen System Anti-Skid Brakes Engine Fan/Turbine Synch Super Soundproofing w/Kevlar Batts Stainless Steel Fasteners in Cowl & Access Panels Sierra Quick-Release Radome Mod Lead Acid Battery Gross Weight Increase Mod Aft Baggage Mod Recognition Lights Strobe Lights |
|
| Engines | |
|
Engines: Pratt & Whitney JT15D-4 (2) Engine 1 Serial Number: PCE70386 Engine 2 Serial Number: PCE70958 Engine 1 SOH: 3,177 Engine 2 SOH: 3,191 Engine 1 SHI: 1,342 Engine 2 SHI: 1,418 TBO: 3,500 hours each |
|
| Engine 1 Hours: | 3,177 SNEW |
| Engine 2 Hours: | 3,191 SNEW |
| Interior & Exterior | |
|
Refurbished: 2021 Configuration: Executive, 11 Passengers Air Conditioning: Freon New Stretched Tan Leather Interior (2021) Seating: Five Single Seats, Aft 3-Place Bench Ultraleather Headliner Navy Leather Lower Sidewalls Tan Wool Carpeting (2018) Wood Laminate Cabinetry Dual Aft Writing Tables Enclosed Belted Flushing Forward Lavatory |
|
| Year Interior: | 2021 |
|
New Exterior Paint in 2022 Colors: Matterhorn White Upper and Red Lower with Gold Stripes |
|
| Year Painted: | 2022 |
| Other Info | |
|
Inspection Status: Maintained: FAR Part 91 RVSM Certified Phase 1 Inspection c/w 08/25 Phase 2 Inspection c/w 08/25 Phase 3 Inspection c/w 08/25 Phase 4 Inspection c/w 08/25 Phase 5 Inspection c/w 08/25 |
|
| Brochure: | View Brochure |