| Overview | |
| 2002 Cessna Citation Encore, Serial Number 560-0632. Part 91 operated. Total time 4,437 hours with 3,961 landings. Engines enrolled in JSSI Complete program. CESCOM current. No damage history. Paint and interior updated in 2014. | |
| Price: | Contact Seller |
| Offered By: | Leviate Air Group |
| Registration: | N105TD |
| S/N: | 560-0632 |
| Location: |
United States
|
| Days Active: | 51 days ago |
| Airframe | |
|
Total Time: 4,437 Hours Total Landings: 3,961 Part 91 Operated CESCOM Status: Current Always Hangared |
|
| Total Time: | 4,437 Hours |
| Landing Cycles: | 3,961 |
| Number of Seats: | 11 |
| Pressurized: | Yes |
| Avionics | |
|
Honeywell Primus 1000 3-Tube EFIS Honeywell Primus 1000 IFCS with Autopilot Honeywell Primus 1000 IFCS Flight Director Garmin GTN 750 Navigator Garmin GTN 650 Navigator Dual Garmin GTX 3000 Mode S Transponders Garmin GDL 69A SiriusXM Datalink Garmin GDL 88 Datalink Garmin Flight Stream 510 Garmin GMA 35C Audio Panel Dual DMEs Honeywell Mark VII EGPWS SPZ 500 Auto Flight Control System TCAS II with Change 7 Primus 660 Weather Radar Bendix FGS 70 Flight Guidance System WAAS/LPV Capable |
|
| Additional Equipment | |
|
Tail Logo Lights USB Charging Ports in Cockpit and Cabin Shadin Avionics AIS 380 DC Fuel Flow Adaptor Aft Belted Lavatory Forward Galley Internal Baggage Capacity: 28 cu ft |
|
| Engines | |
|
Engine 1: Pratt & Whitney PW535A S/N: PCE-DC0195 Total Time: 4,437 Hours SNEW Cycles: 3,961 Program: JSSI Complete Engine 2: Pratt & Whitney PW535A S/N: PCE-DC0194 Total Time: 4,437 Hours SNEW Cycles: 3,946 Program: JSSI Complete |
|
| Engine 1 Hours: | 4,437 SNEW |
| Engine 2 Hours: | 4,437 SNEW |
| Interior & Exterior | |
|
Seating: 2 Crew + 9 Passengers Leather: Olympia Porcelain Tan Cabinetry: Walnut Carpeting: Eden Wool Sidewalls: Stingray Aft Belted Lavatory Forward Galley Updated 2014 |
|
| Year Interior: | 2014 |
|
Matterhorn White Overall Black Tail with Lower Black and Gold Striping Painted 2014 Always Hangared |
|
| Year Painted: | 2014 |
| Other Info | |
|
Inspection Status: Phase B: Due 3/2026 (Completed) Phase 1-4: Due 5/2027 Phase 5: Due 7/2026 CESCOM Status: Current No Damage History |
|
| Damage: | No known current or historical damage |
| Brochure: | View Brochure |