| Overview | |
| 2006 Hawker 400XP, S/N RK-493. FAR Part-135 operated with fresh maintenance and a 2025 interior refurbishment. Collins Pro Line 4 avionics with TCAS Version 7.1 and a flight data recorder. | |
| Price: | Contact Seller |
| Offered By: | Guardian Jet LLC |
| S/N: | RK-493 |
| Location: |
Brazil
|
| Days Active: | Today |
| Airframe | |
|
Total Time: 2,797 Hours Landings: 2,204 Status as of March 25, 2026 FAR Part-135 Operated Fresh Maintenance |
|
| Total Time: | 2,797 Hours |
| Landing Cycles: | 2,204 |
| Number of Seats: | 8 |
| Pressurized: | Yes |
| Avionics | |
|
Collins Pro Line 4 Autopilot: Collins APS-850A FMS: Dual Collins FMC-5000 AHRS: AHS-3000A VHF Comms: Dual Collins VHF-422C VHF Navigation: Dual Collins VIR-432 ADF: Collins ADF-462 DME: Dual Collins DME-442 RMI: Dual Collins SDU-640B Transponder: Dual Collins TDR-94D Radar: 4 Color Doppler Collins TWR-850 Doppler Turbulence Avoidance Radar Audio: Dual DB System Model 438 Audio Systems Radio Altimeter: Collins ALT-1000 CVR: L3Harris FA2100 FDR: L3Harris F1000 ELT: Artex C406-2 Traffic Avoidance: Collins TCAS-4000 with Change 7.1 Garmin GPS400 Nav with Garmin GMX 200 Display (None Coupled) DBU |
|
| Additional Equipment | |
|
WAAS/LPV XM Weather VNAV TWAS RVSM (Brazilian Airspace) Forward Galley Coffee Maker |
|
| Engines | |
|
Engines: P&W JT15D-5R Engine 1 S/N: PCE-JA0784 - 2,797 Hours Since New Engine 2 S/N: PCE-JA0787 - 2,751 Hours Since New Not Enrolled on an Engine Program |
|
| Engine 1 Hours: | 2,797 SNEW |
| Engine 2 Hours: | 2,751 SNEW |
| Interior & Exterior | |
|
2025 Interior Refurbishment Eight Passenger Interior (7 + 1) Forward Four Place Club with an Aft Facing Seat Two Forward Facing Seats Belted Lavatory Forward Galley Coffee Maker |
|
| Year Interior: | 2025 |
|
Original Paint Well Maintained Factory Original Paint White with Light and Dark Brown Stripes |
|
| Other Info | |
|
Inspection Status: Inspection A - Complied March 2026, Next Due in 200 Hours Inspection B - Complied April 2025, Next Due September 2026 Inspection C - Complied December 2024, Next Due October 2028 Maintenance Tracking: Traxxall Chapter 5: Program Maintenance Schedule |
|
| Brochure: | View Brochure |