| Overview | |
|
Engine 1 Hot Section Completed July 2026 approx TT 5,250 Engine 2 Hot Section Completed March 2026 approx TT 5,250 Both Engines On Power Advantage Program $173.99 per engine per hour Airframe enrolled on Pro Parts at $251.37 per hour Doc 11 Inspection Completed March 2026 (Due March 2032) Garmin G1000 NXi Upgrade (July 2025) ADS-B Out Compliant RVSM Equipped 2024 Paint & Interior 3 Owners Since New Enrolled on CESCOM Hangared its whole life Great ownership pedigree with clean records Featured on the cover of a Sherwin Williams catalogue This is a retail-grade, turn-key aircraft for the discerning owner-pilot who values cosmetics, attention to detail, and the peace of mind that comes from knowing exactly where every dollar was spent before they wrote the check. *Specifications and description are subject to verification by Purchaser. |
|
| Price: |
$1,895,000 USD
|
| Offered By: | AirplaneIQ |
| Registration: | N684TH |
| S/N: | 510-0067 |
| Home Airport: | KSCH (Airnav) |
| Location: |
New York United States
|
| Days Active: | 1 day ago |
| Airframe | |
| Total Time: | 5,597 Hours |
| Landing Cycles: | 4,450 |
| Avionics | |
|
Garmin G1000 NXi Integrated Flight Deck (STC SA01896WI — Upgraded July 2025) GWX 68 Doppler Weather Radar GDL-69A SiriusXM Weather Datalink ADS-B Out (Completed March 2019) RVSM Equipped WAAS / LPV Equipped |
|
| Engines | |
|
Pratt & Whitney Canada PW615F-A Engine 1: S/N: PCE-LB0871 TTSN: ~ 5,250 hrs Status: Down for Hot Section Engine Overhaul: March 2018 Programs: On Programs Engine 2: S/N: PCE-LB0146 TTSN: ~ 5,250 hrs Status: Hot Section Completed Mar 2026 Programs: On Programs NOTE: Engine 1 is currently removed for Hot Section Inspection. Total time is within +/- 10 hours of Engine 2. |
|
| Engine 1 Hours: | 5,250 SNEW |
| Engine 2 Hours: | 5,250 SNEW |
| Interior & Exterior | |
| Refurbished in 2024, Grey diamonded leather and accents. | |
| Year Interior: | 2024 |
| 2024 Paint — Space Grey Base with Blue Bottom, Black and Green Striping | |
| Year Painted: | 2024 |
| Other Info | |
|
Inspection Status: Doc 11 Inspection Completed March 2026 (72-Month Interval — Due March 2032) |
|
| Damage: | No known current or historical damage |