2016 Gulfstream G650ER

Overview
2016 Gulfstream G650ER s/n 6188 with 3,323 hours total time and 1,055 landings.
13 passenger forward galley with forward crew rest Hallmark floorplan.
One U.S. Fortune 100 owner, always hangared since new, no incidents/stories/damage.
Engines on Rolls-Royce CorporateCare; APU on Honeywell MSP Gold.
SpaceX Starlink hi-speed internet service & WiFi.
FANS 1/A+ / CPDLC, ADS-B Out v2, TCAS 7.1.
Block III Baseline completed.
Hangared at Morristown Airport (MMU) in Morristown, NJ.
Price: Contact Seller
Offered By: Leading Edge Aviation Solutions
Registration: N82A
S/N: 6188
Home Airport: MMU (Airnav)
Location: Morristown, New Jersey
United States
Days Active: Today
Airframe
3,323 Hours Total Time
1,055 Landings
Certificate of Airworthiness (CofA): February 2016
Entry Into Service: July 2016
One U.S. Fortune 100 Owner
Always Hangared Since New
No Incidents/Stories/Damage
Basic Empty Weight: 53,322.6 lbs.
Basic Operating Weight: 55,121.4 lbs.
Total Time: 3,323 Hours
Landing Cycles: 1,055
Avionics
Block III Baseline Completed
Gulfstream PlaneView Avionics System
Triple (3) Flight Management Systems (FMS)
Enhanced NAV (FANS-1/A+ w/ CPDLC)
Four (4) Large Flat Panel LCD Electronic Display Units (Pilot PFD-MFD & Copilot PFD-MFD)
Triple (3) Modular Avionics Units (MAUs)
Guidance Panel
Dual (2) Standby Multifunction Controllers (SMC)
Triple (3) Multi-Function Control Display Units (MCDU)
Dual (2) Cursor Control Devices (CCD)
Four (4) Multifunction Air Data Probes (MFP) Air Data System
Triple (3) Inertial Reference Systems (IRS)
Dual (2) Global Positioning Systems (GPS) w/ Wide Area Augmentation System (WAAS)
Synthetic Vision - Primary Flight Display (SV-PFD)
Head-Up Display (HUD)
Enhanced Vision System (EVS)
Automatic Flight Guidance System
Autothrottle System
One (1) Data Loading LAN Management Unit (DLMU)
Dual (2) High Frequency (HF) Communications
Triple (3) Very High Frequency (VHF) Communications
One (1) VHF Communication / Navigation (NAVCOM) Unit
VHF Navigation, Instrument Landing System (ILS), and Marker Beacon
Dual (2) Mode S Transponders w/ ADS-B Out Capabilities (DO-260B Compliant)
Traffic & Collision Avoidance System (TCAS II v7.1)
Dual (2) Distance Measuring Equipment (DME) Transceivers
Multi-channel Satellite Communications System (SATCOM) - 2 Voice & 1 Data Channel
Dual (2) Enhanced Ground Proximity Warning Systems (EGPWS)
Flight Data Recorder System (FDR) - Twenty-Five (25) Hour Recording (88 Parameters)
Cockpit Voice Recorder (CVR) - Twenty-Five (25) Hour Recording
3-D Color Weather Radar Honeywell IntruVue RDR-4000
Dual (2) Digital Radio Altimeters
Central Maintenance Computer (CMC)
Emergency Locator Transmitter (ELT)
Pilot & Copilot Emergency Vision Assurance Systems (EVAS)
Automated Direction Finder (ADF)
Additional Equipment
Starlink Satellite System
Jet Connex Ka-band Hi-Speed Internet
Honeywell AIS-2000 Multi-Region Airborne Information System
Honeywell Inmarsat Satellite Communication System
Satcom Direct Router
Wireless (Wi-Fi) Local Area Network (LAN) System w/ Shared Network Printer
Dual Slot Blu-Ray/DVD/CD Player
Gulfstream CabinView Passenger Flight Information System
SecuraPlane 500 Aircraft Security System
Major Aircraft Service Changes, Enhancements & Upgrades:
ASC 003A: Comm. Mgmt. Function (CMF) - SATCOM Direct Datalink Service Provider
ASC 004C: AHTMS Health Trend Monitoring Cell Data Transmission
ASC 005: Runway Awareness Advisory System (RAAS) - Installation
ASC 006: Lightning Sensor System (LSS) - Installation
ASC 007: Predictive Windshear (PWS) - Activation
ASC 016: Engine Electronic Controller - K7.1.3 Software Upgrade
ASC 026: 74,900 Lb. Weight Limitation
ASC 027: 90,000 Lb. Weight Limitation
ASC 028: 95,000 Lb. Weight Limitation
ASC 029: 100,000 Lb. Max Ramp Gross Weight / 99,600 Lb. Max Takeoff Gross Weight
ASC 036: ADS-B Out Version 2 - Installation
ASC 038A: PlaneView II Avionics Enhancement
ASC 048 Part II: Spoiler Joint Anti-Rotation Retention Washer - Installation
ASC 051A: Secondary Power Distribution System (SPDS) Software Update
ASC 055B: Autobrake System - Installation
ASC 065: Main Entrance Door Manual Operation Mechanism
ASC 066: Main Entrance Door (MED) - EMED Rigging Improvement
ASC 068: Baggage Compartment Grab Handle - Installation
ASC 069: Primary Flight Control Actuation Syst. Remote Electronics Unit Software Update
ASC 070: Cockpit AIR Ducting - Velocity Reduction
ASC 073: Tire Pressure Monitoring Unit (TPMU) Software Upgrade
ASC 074: Nose Wheel Steering System - Upgrade
ASC 076B: Aircraft Health and Trend Monitoring System - Software Update 2
ASC 079: Landing Gear Control Unit Mod D Update
ASC 081A: Med Latch Actuator Upgrade
ASC 083: Flap Track D Rub Strips - Removal
ASC 084A: Main Landing Gear and Brake Assembly - Modification
ASC 085: Ka-Band Fin CAP Radome Installation
ASC 086: Main Entry Door - Service Door Panel Security Cover - Installation
ASC 088A: Engine Electronic Controller - K8.0.2 Software Upgrade
ASC 089: Doors (ATA 52), MED - Bottom Folding Step Stop Bolts - Replacement
ASC 090A: Hydraulic Filter Monitoring System - Installation and Activation
ASC 091A: Acoustic Door Noise Reduction - Modification
ASC 092: Primary Flight Control Motor Control Electronic Software Upgrade
ASC 093: Flight Controls (ATA 27) - FCC Software Update
ASC 095: APU Enclosure Installation - Modification
ASC 096: 8.8 KHZ Underwater Acoustic Beacon (UAB) Installation
ASC 097: Primary Flight Control Actuation System REU Connector Update
ASC 098: Horizontal Stabilizer Control Unit Software Update
ASC 099A: Main Entrance Door - Bottom Folding Step Mechanism Improvement
ASC 100: Planeview II Avionics Enhancement
ASC 101A: Steep Approach to Landing Activation
ASC 102: Modification FCC Software v8.2 Update
ASC 103: Auxiliary Hydraulic Pump - Grounding Installation
ASC 105A: Data LAN Management Unit Harness - Service Loop Installation
ASC 110: Flap Electronic Control Unit (FECU) Software Update
ASC 113A: APU Exhaust Fairing Drainage - Modification
ASC 116A: Battery Charger MODE Control Relays & Elec. Backup Hyd. Actuator Battery Charger No. 2 - Removal
ASC 117: Hyd Line Support Bracket Install - Mod to Provide Side Brace Actuator Clearance
ASC 118: Aft Equipment Bay Water Shield - Installation
ASC 122A: Engine FIRE Extinguishing Bottle Cartridge - Wiring - Modification
ASC 123A: APU Electronic Control Unit Software - Update
ASC 124A: Pylon Seal Retainer - Modification
ASC 125: Heads Up Display (HUD) II Software Update
ASC 129: Flap Track D Up-Stop Fitting - Improvement
ASC 131: Flap Track C Roller Fitting - Rub PAD Installation
ASC 133: Engine Electronic Controller - K9.0.1 Software Modification
ASC 134B Part I/II: Wedge Installation - Trailing Edge, Rudder
ASC
Engines
Rolls Royce BR700-725A1-12
On Condition & Enrolled on Rolls-Royce CorporateCare
Left (#1): SN 25485, 3,323 Total Hours, 1,055 Total Cycles
Right (#2): SN 25484, 3,323 Total Hours, 1,055 Total Cycles
APU: Honeywell RE220 (G650), Enrolled on Honeywell MSP Gold, SN P-301, 1,754 Hours
Engine 1 Hours: 3,323 SNEW
Engine 2 Hours: 3,323 SNEW
Interior & Exterior
Completed 2016 @ Gulfstream - Savannah, GA
The 13 Passenger Forward Galley with Forward Crew Rest Hallmark Interior features a crew jump seat, forward crew lavatory, forward crew rest area, forward main galley, and aft main lavatory.
The entry area includes the Left-Hand Side forward crew lavatory, Right-Hand Side forward crew rest area, the Left-Hand Side full-service main galley and Right-Hand Side forward full-service main galley annex.
The entry area and forward cabin are separated by an electric pocket door.
The interior features a 3-zone cabin with a forward cabin 4-place club with stowable executive writing and dining tables between the opposing club chairs, a mid-cabin 4-place conference group opposite a credenza, followed by an aft room with single 3-place divan opposite a left side 2-place club.
There are 26-inch monitors on the forward and aft bulkheads as well as one pop-up 26 inch monitor in the credenza.
There are also 12-inch monitors located in the arm rest of each cabin chair.
Multiple 115VAC/60Hz outlets are located throughout the cockpit, vestibule, lavatories, cabin, and baggage compartment areas.
Year Interior: 2016
Completed June 2016 @ Gulfstream - Savannah, GA
Overall Matterhorn White with Black Pearl Striping and Gray Cumulus Pearl Accents.
Year Painted: 2016
Other Info
Inspection Status:
Engines are On Condition (Task Oriented) & Enrolled on Rolls-Royce CorporateCare
APU Enrolled on Honeywell MSP Gold
Aircraft Enrolled on MSG-3 Program and Gulfstream MYCMP Maintenance Tracking Program
12 Month: Last Completed May 2026, Next Due May 2027
24 Month: Last Completed May 2025, Next Due May 2027
36 Month: Last Completed May 2024, Next Due May 2027
48 Month: Last Completed May 2024, Next Due April 2028
72 Month: Last Completed May 2022, Next Due June 2028
96 Month: Last Completed May 2024, Next Due June 2032
144 Month: Next Due June 2028
192 Month: Next Due June 2032
Damage: No known current or historical damage
Brochure: View Brochure
Aircraft Documents (1)
1 document(s) available for verified members. Sign in or register to view.
Seller Website