| Overview | |
|
Engines Enrolled on MSP Gold APU Enrolled on MSP Gold Airframe Enrolled on Smart Parts Preferred FANS 1/A Compliant Gogo AVANCE L5 Internet (Provisions for 5G) 10 Passenger Configuration w/ Divan |
|
| Price: | Contact Seller |
| Offered By: | Jetcraft Corporation |
| S/N: | 20503 |
| Location: |
United States
|
| Days Active: | 6 days ago |
| Airframe | |
|
Maintenance Tracking TRAXXALL Certification Currently Operated – FAA Part 91 Program Coverage Smart Parts Preferred |
|
| Total Time: | 2,141 Hours |
| Landing Cycles: | 1,538 |
| Avionics | |
| Additional Equipment | |
|
CONNECTIVITY & ENTERTAINMENT Type of Unit Description Display Monitors Forward and Aft Bulkheads Cabin Management System Lufthansa Nice Internet Gogo AVANCE L5 (Provisions completed for LX5) NOTABLE AVIONICS SERVICE BULLETINS Service Bulletin Description SB 350-23-001 Installation of the Dual HF Option SB 350-23-003 Installation of the 3rd VHF Communication Option SB 350-23-010 Upgrade of the Datalink System to Meet Eurocontrol’s Link2000+ SB 350-23-011 Introduction of Future Air Navigation System (FANS 1/A) SB 350-34-008 TAWS – Installation and Activation of SmartRunway and SmartLanding Option |
|
| Engines | |
|
Left Engine Right Engine Description Honeywell AS907-2-1A / HTF7350 Serial Number(s) P136133 P136134 Total Cycles Since New 1,552 Cycles 1,548 Cycles Program Coverage MSP Gold |
|
| Engine 1 Hours: | 2,141 SNEW |
| Engine 2 Hours: | 2,141 SNEW |
| Interior & Exterior | |
|
Number of Passengers - Nine (9) + One (1) Belted Lavatory Galley Location - Forward Forward Cabin Configuration - Four (4) Place Double Club Aft Cabin Configuration - Three (3) Place Divan Opposite Two (2) Place Club Lavatory Location(s) - Aft Executive (Belted) Refurbishment Date - Original Completion |
|
|
Base Paint Color(s) - Matterhorn White Stripe Color(s) - Marlin Black and Aristo Blue Last Painted Date - Original Completion |
|
| Other Info | |
|
Inspection Status: Inspection Last Performed Next Due 12 Month April 2025 April 2026 24 Month June 2024 April 2026 48 Month June 2022 June 2026 96 Month May 2022 May 2030 |
|
| Brochure: | View Brochure |