Overview | |
Listing Status: | Inactive |
SPLIT SCIMITAR WINGLETS STAGE A NOISE COMPLIANCE 8 AUXILIARY FUEL TANKS ALWAYS HANGERED SWIFTBROADBAND INTERNET 14 PASSENGER CONFIGURATION |
|
Price: | N/A |
Offered By: | Jetcraft Corporation |
Registration: | - |
S/N: | 61040 |
Location: |
Taipei Taiwan ![]() |
Airframe | |
Total Time: | 809 Hours |
Landing Cycles: | 205 |
Avionics | |
Additional Equipment | |
FAA STC ST0716NY-D: PATS Auxiliary Fuel System (AFC) – Install 8 cell AFS, Configuration 1-W (3 FWD, 5 AFT) by PATS. FAA STC ST00405LA-D: Smoke Detection / Fire Suppression System -Install the 3rd Fire Extinguisher in Fwd Cargo Compartment by PATS. FAA STC ST01697SE: Lower Cabin Altitude (LCA) Modification – Accomplished Cabin Altitude Reversion to 6,500 Feet In Lieu of 8,000 Feet at 41,000 Feet FAA STC ST00830SE / EASA STC 10015323 R13: APB SSW Modification – Installation of APB Winglets, Split Scimitar Winglets Design by Sabena Technics. EASA STC 10055637: BBJ Turnkey Taiwan Eagle Conversion VIP – Interior Cabin (VIP Config) Completion by Sabena Technics. CONNECTIVITY High Speed Internet - SwiftBroadband Internet Phone System - Yes |
|
Engines | |
Left Engine Right Engine Description CFM 56-7B27E/B3 Serial Number(s) 660761 660765 Total Cycles Since New 205 Cycles 205 Cycles |
|
Engine 1 Hours: | 809 SNEW |
Engine 2 Hours: | 809 SNEW |
Interior & Exterior | |
Number of Passengers - Thirteen Passenger + Two Flight Attendant + One Crew Office Seat approved for Passenger TTOL Galley Location - Fwd Entry Seats - Two (2) Single Seats (Flight Attendant) Business Lounge Configuration - Twelve (12) Business Class Lounge Single Seats VIP Lounge Configuration - Two (2) 5 Place Divan (Not Approved for Take Off and landing) VIP Bedroom Configuration - Double Sized Bed opposite One (1) VIP Single Seat Lavatory Location(s) - Fwd Crew and Aft VIP Crew Rest - Fwd Single (1) Seat (Approved for Passenger TTOL) Jumpseat - Yes |
|
Base Paint Color(s) - Matterhorn White and Blue Belly Stripe Color(s) - Gold |
|
Other Info | |
Inspection Status: Inspection Last Performed Next Due 12 Month Inspection December 2020 December 2021 24 Month Inspection December 2019 December 2021 36 Month Inspection December 2018 December 2021 48 Month Inspection December 2019 December 2023 72 Month Inspection – February 2022 96 Month Inspection – February 2024 |
|
Brochure: | View Brochure |